Our 6-Stage Construction Workflow
From initial site soil bearing inspection and 2D/3D Vastu blueprints to foundation excavation, slab casting, and ceremonial key handover—every single milestone is executed with military precision.
From Foundation Pit to Dream Home
Transparent milestone inspections and daily WhatsApp photographic reporting.
Soil Survey & 2D/3D Vastu Blueprints
Physical plot dimensions check, soil strata analysis, 2D floor plans with 100% directional Vastu Shastra compliance, and 3D elevation renders.
Earthwork & Anti-Termite Foundation
Excavation to hard gravel strata (5ft to 6.5ft), anti-termite chemical trench barrier, PCC bed, and isolated RCC column footings.
Plinth Beam & 9-Inch Red Brick Masonry
Reinforced plinth beam grid with DPC water barrier, soil compaction, and 9-inch wire-cut red brick wall construction with lintel beams.
Roof Slab Shuttering & Concrete Casting
Tata Tiscon Fe-550D two-way rebar mesh, fan hook boxes, machine-batched M20/M25 concrete pour, and 28-day water ponding curing.
Concealed MEP & Double-Coat Plastering
Finolex FRLS electrical conduit routing, Supreme CPVC waterline pressure testing, chicken mesh joint application, and smooth cement plastering.
Flooring, Woodwork, Painting & Handover
Double charged vitrified tiles, 1st quality Teak main door, Asian Paints Royale finish, deep cleaning, and 15-year warranty handover.